An impressive third rate man of war is in the make by Eurobricks member Dread Pirate Wesley. It will be built on a brickbuilt hull, with much attention to detail and historical accuracy, but also enough room for personal taste. The prototype of the bow has already been built, and it doesn’t look bad at all.
Have a look at this Ship-of-the-Line under construction
by Dread Pirate Wesley.